ClearPathCompliance India +91 92521 92607Get a free quote

Licensing consultant for food and water plants across India

Every approval your plant needs, handled end to end.

FSSAI, BIS, groundwater NOC, Pollution Control Board consents, factory licence and fire NOC for food, beverage and packaged drinking water plants. One team prepares the files, follows up with every department and tracks your renewals.

  • Fixed quote, government fees at actuals
  • Run by people who have run plants
  • Plants across India

What are you setting up?

    Licences we handle

    The six approvals almost every food, beverage and water plant needs, plus the registrations that come with selling packed products.

    FSSAI licence

    For any unit that manufactures, packs or stores food or beverages.

    • Registration, State or Central licence
    • Modification and annual fee
    • Annual return filing
    FSSAI licence details

    BIS certification

    ISI mark under IS 14543. Voluntary under FSSAI, but now compulsory in Uttar Pradesh. We advise if you need it.

    • Requirement check
    • Application and factory inspection
    • Surveillance and renewal
    BIS certification details

    Groundwater NOC

    Permission from CGWA to draw groundwater for industrial use.

    • Block category check
    • Water balance and reports
    • Flow meter and renewal compliance
    CGWA NOC details

    Pollution Control Board consent

    Consent to Establish before you build, Consent to Operate before you produce.

    • Category check and filing
    • Query replies and inspection
    • CTO renewal and annual returns
    CTE and CTO details

    Factory licence

    Building plan approval before construction, registration before you start.

    • Plan approval under state rules
    • Registration under the OSH Code
    • Returns and renewals
    Factory licence details

    Fire NOC

    Provisional NOC on building plans, final NOC once fire systems are installed.

    • Requirement check and drawings
    • Inspection coordination
    • Renewal tracking
    Fire NOC details

    Setting up a packaged drinking water plant?

    See all 11 approvals in the order you need them, including the 2026 change to BIS.

    Open the checklist

    Also handled: Legal Metrology packer registration, Plastic EPR, and GST and Udyam registration.

    How we take your plant from land to licence

    Approvals have to come in the right order. We plan the sequence before anything is filed.

    Free requirement check

    Tell us your location, product and capacity. We list every approval you need, with a fixed quote.

    Pre-construction approvals

    CTE, groundwater NOC, factory plan approval and fire drawings, filed before you build.

    Commissioning approvals

    CTO, factory licence, final fire NOC, FSSAI and Legal Metrology before production starts.

    Renewals tracked

    We track every expiry and filing date, and remind you well before each is due.

    Never miss a renewal or return again.

    Our annual compliance plan covers the renewals and periodic returns for every licence your plant holds, with reminders well before each due date.

    Ask about the annual plan
    • PCB consent renewalas per consent
    • FSSAI annual fee and returnyearly
    • FSSAI inspection and testingyearly and monthly
    • CGWA NOC complianceper NOC
    • Plastic EPR returnsyearly
    • Factory returnsper state rules

    Built for plant owners

    We started ClearPath after years of running plants and chasing these approvals ourselves. We know what departments ask for, because we have had to answer them.

    We have run plants

    We understand production, water balance and inspections from the inside, so files match how your plant really works.

    One team, every department

    Pollution board, groundwater, factories, fire and FSSAI, handled together so one approval never holds up another.

    Fixed quotes

    One fee for our work, agreed upfront. Government fees are paid at actuals and shown separately on every quote.

    Quick follow-up

    Complete files, fast replies to queries and regular follow-up: that is what keeps approvals moving.

    Our work

    Photos from a packaged drinking water plant we set up and run, and approvals we have obtained.

    Plant photos

    RO water treatment plant
    RO water treatment
    PET bottle blow moulding machine
    PET blow moulding
    Rinse, fill and cap monobloc
    Rinse, fill and cap
    High-speed bottle filling line
    Filling line
    Bottle labelling machine
    Labelling
    Quality control chemistry lab
    QC chemistry lab
    Microbiology lab
    Microbiology lab
    Finished goods warehouse
    Finished goods warehouse

    Licences obtained

    CGWA groundwater NOC
    CGWA groundwater NOC
    Pollution Control Board Consent to Operate
    PCB Consent to Operate
    FSSAI licence
    FSSAI licence
    Factory licence
    Factory licence

    Common questions

    Something else on your mind? Email info@clearpathcomplianceindia.com and we will reply within one working day.

    Which approvals do I need before construction starts?

    Usually Consent to Establish from the Pollution Control Board, the groundwater NOC if you will use a borewell, and factory building plan approval. Fire drawings are also planned at this stage. The rest come at commissioning.

    Are government fees included in your fee?

    No. Government fees are paid at actuals and shown separately on every quote, so you see exactly what goes to the department.

    Can you guarantee how long an approval will take?

    Processing time depends on each department. We make sure files are complete, answer queries quickly and follow up regularly, which is what keeps approvals moving.

    Do you work with plants outside Rajasthan?

    Yes. Most applications are filed online, and we coordinate inspections and site visits wherever your plant is.

    What does the annual compliance plan cover?

    Renewals and periodic returns for the licences your plant holds, with reminders well before each due date.

    Start your plant file today.

    Send a few details about your plant. We reply with the list of approvals you need and a fixed quote, usually within one working day.

    Get a free requirement check

    Fields marked * are required.