CGWA
CGWA NOC (Groundwater NOC) for Packaged Drinking Water Plants and Industries
Permission to draw groundwater for industrial use, including packaged drinking water plants, under the CGWA guidelines.
Who needs it
If your plant draws water from a borewell or tubewell, it is extracting groundwater, and in most of India that needs written permission. The Central Ground Water Authority (CGWA), under the Ministry of Jal Shakti, issues a No Objection Certificate (NOC) that fixes how much groundwater you may draw, from which borewells, and on what conditions. Drawing groundwater for commercial use without it can lead to sealing of the borewell and a demand for environmental compensation.
- Packaged drinking water and beverage plants, where groundwater is the raw material
- Food processing and other industries using groundwater for processing, washing, boilers or cooling
- Infrastructure projects such as hotels, hospitals, warehouses, commercial complexes and townships
- Mining projects, whatever the quantity
- Existing units as well as new ones. A running plant without an NOC should apply as early as possible.
Exemptions, and why you still need to apply
Micro and small enterprises drawing less than 10 KLD (10,000 litres a day), and industries using groundwater only for drinking and domestic use up to 5 KLD, are generally exempt from the NOC. Exempt does not mean doing nothing: you still apply online for an exemption certificate and install a digital flow meter on the borewell.
Your area's category decides what is possible
CGWA classifies every block as Safe, Semi-Critical, Critical or Over-Exploited, based on how much of its groundwater is already being used.
- In Over-Exploited blocks, new industries are generally not given NOC, except MSMEs.
- New packaged drinking water units are not allowed in Over-Exploited blocks, even as MSMEs. Water for workers' drinking needs and green belt may still be permitted.
- Projects drawing more than 100 KLD in Over-Exploited, Critical or Semi-Critical blocks need an impact assessment report.
- Abstraction charges and conditions are stricter as the category worsens.
Some states and union territories have their own groundwater authority and regulate extraction themselves. In those states the application goes to the state authority instead of CGWA. We tell you which one applies to your site.
What we do
- Site check before you commit. We confirm your block's category and the authority that applies, ideally before you buy or lease land.
- Water requirement and water balance. We work out a realistic daily requirement from your capacity and process, including RO reject and recovery, so abstraction charges are not inflated and the figures match your Pollution Control Board application.
- Technical reports. Where the quantity or category requires it, we coordinate the hydrogeological or impact assessment report with a qualified hydrogeologist.
- Recharge and metering plan. We plan rainwater harvesting or recharge structures, the digital flow meter and, where required, the piezometer and telemetry.
- Online application. We prepare and file the NOC or exemption application, with government charges paid at actuals.
- Queries and site visits. We answer queries quickly and coordinate any field verification until the NOC is issued.
- Compliance after issue. We track abstraction charges, meter records, compliance reports and the renewal date.
- Changes and expansion. We apply for a revised quantity before you increase extraction or add a borewell.
Documents usually needed
- Land ownership or lease documents
- Site plan with borewell locations and coordinates
- Details of each borewell: depth, diameter, pump capacity
- Water requirement and water balance chart
- Hydrogeological or impact assessment report, where required
- Rainwater harvesting or recharge plan
- Digital flow meter and piezometer details
- Groundwater quality test report, where asked
- Pollution Control Board consent or application
- Company or firm registration documents
- Authorisation letter and ID of the signatory
- Previous NOC, for renewal or expansion
How it works
- Area checkWe find your block's category, the authority that applies and the conditions you will face.
- Water balanceWe calculate a realistic requirement and prepare the water balance and recharge plan.
- ReportsAny required hydrogeological or impact assessment report is prepared with a qualified expert.
- ApplicationThe NOC or exemption application is filed online, with charges paid at actuals.
- ReviewWe answer queries and coordinate any site verification until the NOC is issued.
- ComplianceWe track meter records, compliance reports, abstraction charges and renewal.
Keeping the NOC valid
Most groundwater problems in running plants come after the NOC, not before it. To stay compliant:
- Keep the digital flow meter working and record monthly abstraction
- Build and maintain the recharge structures promised in the application
- Do not draw more than the permitted quantity, and apply before increasing it
- File compliance and water-quality reports on time
- Apply for renewal well before the NOC expires
Common questions
Do I need a CGWA NOC if I draw less than 10 KLD?
Micro and small enterprises drawing less than 10 KLD are generally exempt from the NOC, but must still apply for an exemption certificate and install a digital flow meter.
Can I set up a new packaged drinking water plant in an over-exploited block?
No. Under the CGWA guidelines, new packaged drinking water units are not granted groundwater NOC in over-exploited blocks, even if they are MSMEs. Check the block before buying land.
My plant is already running without an NOC. What should I do?
Apply as soon as possible. Drawing groundwater for commercial use without an NOC can attract environmental compensation and sealing of the borewell. We can assess your position and file the application.
Is the NOC needed if I use municipal or tanker water?
The NOC is for groundwater you extract yourself through a borewell or tubewell. If you use only supplied water, keep the supply agreement and bills on record for other approvals.
We handle this for plants across India, including Rajasthan, Madhya Pradesh, Uttar Pradesh and Maharashtra. Most applications are filed online, and we coordinate inspections wherever your plant is. Setting up a water plant? See the complete approval checklist for packaged drinking water plants, or read our CGWA NOC guide.
Requirements differ by state, plant category and capacity, and departments revise them from time to time. We confirm the current requirements for your plant before filing.